We are continuing to place embankment material across from the Turnpike Entrance with material excavated on the project. Listed below are a few areas of interest along the project that many people have asked about. We have not progressed as far as we anticipated and the project will stretch into the 2019 construction season. The 2018 construction season went by fast and will be winding down soon. November 2018 Route 31 Reconstruction Project Update – Donegal Township At the Route 381 intersection, the lower concrete island is going to be removed to address safety concerns with traffic flowing thru this intersection.Īll work is weather dependent and is subject to change. ![]() From Route 711 to Route 381, work is anticipated in the next few months to finish this area with final milling, paving, and other miscellaneous work. ![]() Work will also progress to reconstruct the intersection at Route 711. Afterwards, construction of the remainder of the Turnpike lanes are anticipated to proceed thru August and September. ![]() This is anticipated to be completed this summer, with traffic being switched onto the new alignment. ![]() Once grading is complete on the new alignment, subbase and asphalt will be placed as well. Subbase and asphalt are being placed, and new 12-inch concrete pavement will be placed very soon for a portion of the new Turnpike entrance and exit lanes. The contractor is currently preparing grade for the new roadway from the west end of the project, thru the new intersection at the Turnpike, and up to the intersection with Route 711.
0 Comments
Leave a Reply. |